If a load (new or added) requires equipment that is non-standard with the District, and the District is willing to include the new equipment in their standards, the cost of the equipment and a spare, if needed, will be included in the Contribution-in-Aid-of-Construction (CIAC). If any other special installation such as non-standard voltage, closer voltage regulation than required by standard practice, or any other special service required, the cost of installation and maintenance shall be paid by the customer prior to the work being performed.